Monday 1 June 2015

A Pause......

We are having a short pause in work here at Holly Cottage while we sort out a small problem with the levels on the new driveway.

Chance to remind ourselves why we bought this place, with a walk or two with the boys beside our little burn.

The next scheduled job is to reinforce the foundations at the front of the old part of the cottage with a concrete beam.